Coil Transport System ISD Dunafer

ClientClient nameYear2025AuthorAuthor nameShare
In einer Halle sind viele graue zylindrische Coils für den Bundtransport ISD Dunaferr Zrt. zu sehen, mit Blick auf das Bandbeiz-Umfeld.

Coil Transport System ISD Dunafer

Buma Engineering was commissioned to design a Coil Transport System for ISD Dunaferr Zrt.

 The first construction section included the erection of a Coil Transport System to a simultaneously built Strip Pickling line.

As a second section, the existing Coil Transfer System – starting at the Coiler – was rebuilt with new equipment.

The complete mechanical engineering of the whole Coil Transport System was realized within only 3 month.

Technical Data:

Industry: Hot rolling

Customer: ISD Dunaferr Zrt.