Gas Scrubber
- Start of the project: March 2017
The planning phase took place until the shut down in close cooperation with the project team on site.
- Start of erection: June until September 2018
Buma engineering supported the assembly companies on site during the installation.
Scope of supply Basic engineering:
- gas scrubber in DUPLEX
- foundation
- Pipe layout incl. positioning of the valves and scrubber nozzles
- complete steel structures incl. stairs and all maintenance equipment and Disassembly device of the existing vessel
Scope of supply Detail engineering:
- Foundation plans
- complete steel structures incl. stairs and all maintenance equipment and Disassembly device of the existing vessel
Technical Data:
- Weight: 180 tons
- Weight steel structures (platforms): 210 tons
- Height of the scrubber: 33 m
- Diameter of the scrubber: 6,5 m
Industry: Steel plant
Customer: voestalpine Stahl GmbH