Coil Transport System
Customer: voestalpine Stahl GmbH
BUMA engineering was commissioned to develop a replacement for the existing bundles. The new facility should be able to transport bundles of up to 35 tons with a cycle time of 70s. At the same time the coill axis was changed from vertical to horizontal to avoid federal damage. Through the development of the new concept all desired goals could be achieved. The plant has been in full operation since September 2004.
Max. transport weight: | 35 to |
Cycle time: | 70s |
Hydraulic system: | max. 200 bar |
Transport length: | 275 m |