Gas Scrubber
Start of the project: March 2017
The planning phase took place until the shut down in close cooperation with the project team on site.
Start of erection: June until September 2018
Fa. Buma supported the assembly companies on site during the installation.
Scope of supply:
Basic engineering
• gas scrubber in DUPLEX
• foundation
• Pipe layout incl. positioning of the valves and scrubber nozzles
• complete steel structures incl. stairs and all maintenance equipment
• Disassembly device of the existing vessel
Detail Engineering
• Foundation plans
• complete steel structures incl. stairs and all maintenance equipment
Weight: | 180 tons |
Weight steel structures (platforms): | 210 tons |
Height of the scrubber: | 33 m |
Diameter of the scrubber: | 6,5 m |