Coil Transport System
Customer: ISD Dunaferr Zrt.
Buma Engineering was commissioned to design a Coil Transport System for ISD Dunaferr Zrt. The first construction section included the erection of a Coil Transport System to a simultaneously built Strip Pickling line. As a second section, the existing Coil Transfer System – starting at the Coiler – was rebuilt with new equipment.
The complete mechanical engineering of the whole Coil Transport System was realized within only 3 month.
Cycle time: | 117 seconds |
Max. waist dimension: | Ø2.250 x 1.560 mm |
Min. waist dimension: | Ø1.200 x 800 mm |
Max. Bundle weight: | 35 t |