Water Management for the Accelerated Cooling

Customer: voestalpine Grobblech GmbH

Buma made the engineering for the revamp of the accelerated cooling.
For the production of the thermomechanical rolled plates the new water tank and the pump station were installed. For the increasing of the available volume of water a new tank pump station was installed.